This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Basic Design and Environmental Impact Assessment of six cogeneration units 500/4000 MWe in Italy and Turkey