This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Assistance for basic design and tendering for auxiliary e-boiler in Eems plant.
Technical Assistance