Doel 1 & 2 NPPs Decommissioning

Belgium
Linked solutions
Nuclear

The project covered the initial preparatory phase of the dismantling of the first nuclear power plants of ENGIE Electrabel. In 2012, the preparations began for the implementation of the decommissioning of the eldest units.

Client ENGIE Electrabel
Location Doel, Beveren, Belgium
Period 2012 - 2015

Services provided

Basic Design

Owner’s Engineer mission encompassing:

nuclear-doel-cooling-tower-4-belgium-engienuclear-decommissioning-decontamination-cilvaDecommissioning sheet ©Vanden Berghe RenÈ & PartnersBusiness_Line_cover picture

Linked subdomains

The linked subdomains are:
Decommissioning cost & schedule optimization studies Decommissioning scenarios & plans Waste treatment and conditioning Waste radiological characterization