The Government of Pakistan was planning to install a 1,208 MW (net) CCPP base load power plant fired with re-gasified liquefied Natural Gas (RLNG) at Haveli Bahadur Shah - Jhang Shorkot. On 30 April 2018 the combined cycle gas and steam power plant went into operation with one of the highest net efficiency rates worldwide.
Client | Government of Pakistan via National Power Parks Management Co. (PVT.) Ltd. (NPPMCL) |
---|---|
Location | Pakistan |
Period | 2015 – 2018 |
Capacity | 1,208 (net) MWel |
With the trusted expertise of Lahmeyer International