This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Complete new production plant for phenol formaldehyde resins 50.000 t/year including storages and utilities.
PDS