Client | Central Los Guindos |
---|---|
Location | Cabrero, Región del Bío Bío, Chile |
Period | 2018, 2020 and 2021 |
Capacity | 278 MW |
Performance tests for Los Guindos power plant, a backup generation plant consisting of two gas turbines fueled by diesel. First online guided performance test for Coordinador Eléctrico Nacional.
Performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ASME PTC 22 and ISO 2314.