This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
New LNG Truck Loading Bay
FEED
Owner’s Engineer for Execution Phase