Belo Monte is located in the Xingu River, in the municipality of Vitória do Xingu, State of Pará, North Region of Brazil. With 11,233 MW, it will be the country’s second largest hydropower plant.
Sylwin Alpha was at the time of installation the largest and heaviest HVDC substation in the world. Innovative and patented engineering ensured a smooth installation.
Design of: