This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Local Technical Advisor for a hazardous waste-to-energy plant.
Local Technical Advisor
Configuration