Client | Prime Energía |
---|---|
Location | Constitución, Región del Maule, Chile |
Period | 2021 |
Capacity | 53MW |
Performance tests for San Javier I & II power plant, a backup generation plant consisting of 28 generators (28 MTU diesel motors of 1,8 MW each)
Realization of performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ISO 3046 and ISO 15500.