Client | Cerro Dominador CSP |
---|---|
Location | María Elena, Maria Elena, Región de Antofagasta, Chile |
Period | 2021 |
Capacity | 113MW |
Performance tests for the Cerro Dominador power plant. Renewable generation plant, based on a concentrating solar power tower with a steam cycle with installed capacity of 113 MW.
Realization of performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ASME PTC 46 and ASME PTC 6.