The project covered the initial preparatory phase of the dismantling of the first nuclear power plants of ENGIE Electrabel. In 2012, the preparations began for the implementation of the decommissioning of the eldest units.
Architect Engineering for decommissioning of a radioisotope production facility located at Fleurus. The facility features two cyclotrons, laboratories and hot cells