This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Development of two H-class CCPP within the framework of the Capacity Remuneration Mechanism of the Belgian Government.
Client’s Engineer
For several Sites in Belgium: