This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
CO2 pipeline from CO2 flue gas capture facility at ASCOMETAL to JUPITER 1000 e-methane facility.
Project Management mission