This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Carbon Capture and Storage for production of low carbon H2 from natural gas (blue H2)
Technical support to low carbon H2 project developer
Focus of entire value chain of CO2