The task of this project was the assessment of existing and compilation of missing documentation of the wind farm regarding foundations, cable laying, the offshore transformer platform, technical and health and safety standard
Integrated captive H2 offtake
Pre-Feasibility and Feasibility Study
Owner’s Engineer for Pilot Project