Green Duba Integrated Solar CCPP

Saudi Arabia
Linked solutions
Energy

The Kingdom’s first integrated solar and combined cycle (ISCC) power plant.

Client Saudi Electricity Company (SEC)
Location Saudi Arabia
Period 2015 – ongoing
Capacity Combined Cycle 550MW; Integrated Solar Field 50MW

Services provided 

Owner’s Engineer

Configuration

Linked subdomains

The linked subdomains are:
Gas Fired Power Plants

Related references