This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
e-methane production from green H2 and CO2 captured from an incinerator.
Pre-Feasibility Study