This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Pre-feasibility study for the Provence-Alpes-Côte d’Azur region in France. Technical evaluation of a 100% autonomous and renewable energy system.