Weir Ovella construction
- Client
- Gemeinschaftsraftwerk Inn GmbH
- Country
- Austria and Switzerland
- Period
- 2014-2022
Services provided
The Challenge
The construction of a new dam for the ”Gemeinschaftskraftwerk Inn” on the Swiss-Austrian border faced significant spatial and geological challenges due to its location in the narrow, deeply incised Inn valley.
The Solution
The weir project included a weir, a headrace intake, a fish ladder, and a power plant, which utilizes the ecological flow. The eco power plant ensures a seasonally regulated minimum water discharge into the Inn, addressing the high surge loads caused by upstream hydropower operations.
The Impact
By buffering hydropeaking and enabling seasonally adjusted residual water releases, the project enhances ecological conditions in the Inn River while providing water for the downstream hydropower plant.