Nuward

New office for the VRT in Brussels

  • Building
Client
VRT
Country
Belgium
Period
2021-2026
Geoffrey Rezer - Tractebel
Geoffrey Rezer
Business Manager - Buildings
Get in touch
Services provided
  • Basic design
  • Digital Tools
  • Feasibility
  • Quality assurance

The Challenge

The existing VRT building no longer complied with modern construction standards, limiting its ability to support the evolving needs of a dynamic media landscape. To maintain its position as a competitive and forward-thinking broadcaster, VRT made the strategic decision to construct a completely new facility—one that aligns with today’s functional requirements and anticipates future innovations in media production and broadcasting.

The Solution

As part of the Design and Build consortium, Tractebel took on the role of integral engineering partner for the new VRT building. Our multidisciplinary expertise covered structural engineering, electrical systems, sanitary installations, fire safety, acoustics, and energy solutions—including geothermal systems and the GRO sustainability meter. We also ensured the building’s sustainability performance and were responsible for the design of the data centre, a critical component of VRT’s digital infrastructure.

The Impact

The result is a compact, high-performance building that harmoniously integrates with its natural surroundings while maintaining a minimal ecological footprint. Thanks to Tractebel’s comprehensive engineering approach, the new VRT headquarters not only meets stringent sustainability goals but also provides a future-proof environment that supports innovation and operational excellence in public broadcasting.

An compact, open and dynamic media centre is designed where creativity is key. The building is exemplary in terms of user comfort, energy efficiency and adaptability.

Nuward

Sofie Herreman

Head of department Buildings

References

Our contribution in Buildings

All references