Doel Thiange

Long Term Operation Program at Doel and Tihange

  • Building
  • New Build
Client
Electrabel
Country
Belgium
Period
2014-ongoing
Services provided
  • Digital Tools

The Challenge

As the Responsible Designer, Tractebel supports the operator in implementing the Long-Term Operation (LTO) program for Tihange 3 and Doel 4 while maintaining the highest levels of safety and availability for the Belgian fleet. Tractebel has been the Responsible Designer of the Belgian nuclear reactor fleet since its construction 60 years ago.

The Solution

Tractebel leverages its extensive experience and expertise to ensure the safe and efficient long-term operation of Tihange 3 and Doel 4. Our role includes:

  • Developing comprehensive LTO plans and strategies.
  • Ensuring compliance with all safety and regulatory requirements.
  • Providing technical and engineering support throughout the LTO process.

The Impact

The LTO program for Tihange 3 and Doel 4 will ensure the continued safe and reliable operation of these reactors, contributing to Belgium’s energy security and sustainability goals. This program will help maintain a stable supply of low-carbon electricity, supporting the country’s commitment to a cleaner energy future.

"Tractebel's expertise is essential not only in our projects but throughout the life cycle of our nuclear activities: from operation and long-term to decommissioning. Tractebel is part of the integrated teams and provides its knowledge."

Cedric Osterrieth

CEO, ENGIE Electrabel

Doel Thiange

References

Our contribution in Nuclear

All references