COO-Trois-Pont Pumped Storage

  • Pumped Storage
  • COO
  • Refurbishment
  • Upgrating
Client
Electrabel
Country
Belgium
Period
2002 – 2020 (refurbishment phases)
David Levrat Tractebel
David Levrat
Business Manager - Water
Get in touch
Services provided
  • Pre-Feasibility & Feasibility study
  • Owner's or Lender's Engineer
  • Technical & regulatory consultancy

The Challenge

Increase the storage and power performance of the existing Coo pumpedstorage plant by 7.5% while safeguarding reliable operations for the next 40 years. The upgrade had to be conceived and delivered on a live, gridcritical asset, balancing stringent technical, scheduling and regulatory requirements.

The Solution

Modification and expansion of the spillway and flood release facilities.

The Impact

Extended lifetime and increased capacity, reinforcing Belgium’s grid flexibility.

Digital Apps

Re-imagine your impact with our digital solutions

References

Our contribution in Water

All references