Tashkent Thermal Power Cogeneration Plant Construction

Uzbekistan
Linked solutions
Energy

Extending the existing cogeneration plant by the construction of two (2) additional cogeneration plants.

Client JSC “Toshkent Issiqlikelek Trmarkazi”
Location Tashkent, Uzbekistan
Period 2019 – ongoing
Capacity 32 MW each; 2 heat recovery steam generators (HRSG) with capacity of 42Gcal/h

Services provided

Linked subdomains

The linked subdomains are:
Cogeneration (Heat & Power)

Related references