Extending the existing cogeneration plant by the construction of two (2) additional cogeneration plants.
Client | JSC “Toshkent Issiqlikelek Trmarkazi” |
---|---|
Location | Tashkent, Uzbekistan |
Period | 2019 – ongoing |
Capacity | 32 MW each; 2 heat recovery steam generators (HRSG) with capacity of 42Gcal/h |