HV transmission line Stade - Landesbergen

Client
Tractebel Engineering GmbH (final client TenneT TSO GmbH)
Country
Germany
Period
2020-2025
Annelies Bolle
General Manager - IMDC
Kontakt aufnehmen
Erbrachte Dienstleistungen
  • Quality assurance
  • Engineering Procurement Construction Management
  • Power System Development & Economics
  • Project & Contract Management

The Challenge

The wind power generated in the region as part of the energy transition and the offshore energy from Schleswig-Holstein must be distributed without overloading the electricity grid.

The Solution

To increase the transmission capacity from Schleswig-Holstein southwards, the existing 220 kV line between Stade and Landesbergen must be replaced with a new 380 kV link. This includes a new 380 kV switchgear in Stade/West, the extension of the 380 kV switchgear in Sottrum, the replacement of the 220 kV switchgear in Wechold with a 380 kV installation, and the reinforcement of the 380 kV switchgear in Landesbergen.

The Impact

The line increases the transmission capacity for wind energy along the north-south axis and will continue to ensure security of supply and grid stability in Lower Saxony in the future. It is also an important component of the energy transition in Germany as a whole.

Digitale Apps

Gestalten Sie Ihre Wirkung neu mit unseren digitalen Lösungen

Referenzen

Unser Beitrag in Strom- und Gasnetze

Alle Referenzen