This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Capacity Augmentation of three plants.
Capacity
Capacity increase from 60 to 120 TMTPA.