Crude Oil Pipeline

India
Linked solutions
Energy

From LFP to Mangalore / Padur Cavern – Mangalore, Karnataka. 

Client IL&FS Engineering and Construction
Location Mangalore, Karnataka, India
Period 2014 - 2017
Capacity Pipeline Size: 48” x 12 Km and 42” x 36 Km

Services provided

Linked subdomains

The linked subdomains are:
Gas Distribution and CNG